Southern Downs Infrastructure Projects, QLD
Non-residential building approvals over the last 12 months are 0.90× this council’s own three-year average. Those approvals are $23.7m.
Named projects
16 projects.
| Type | Proposed | Active | Completed |
|---|---|---|---|
| Transport | 0 | 5 | 11 |
Largest stated values
Active
- Top Swanfels Road, Swanfels — Construction, $723.4kRoad pavement is in poor condition with multiple failures and poor drainage. Roadside drainage works; make up material, granulate and seal.
- Guy Street, Warwick — Construction, $695.7kSurface is fatigued and cracking. Asphalt pavement resurfacing, stormwater works, kerb & channel and footpath replacement.
Completed
- Connells Bridge Road, Wheatvale — Completed, $2mRoad damaged during the May 2022 flood event.Repairs and improved road surface resilience via concrete stabilised pavements on the bridge approaches.Total cost of proposed project.
- Condamine River Road (Rural Road) — Completed, $1.9mGravel bed level crossing frequently being washed away and requiring replacement, dangerous for drivers to traverse when water visibility is lowConstruction of a concrete bed.
- East Street, Warwick — Completed, $1.5mRoad pavement is in poor condition with multiple failures, cracking, damaged kerb and channel and insufficient drainage. Replace failed pavement with new imported material.
- Freestone Road, Freestone — Completed, $1mPavement has failed in many locations with many road depressions causing vehicles to unexpectedly rise/fallStabilise the pavement with a foamed bitumen treatmentTotal cost of.
- Palmerin Street - Alice Street - WARWICK — Completed, $944.5kStandardise speed limit to 40 km/h along Palmerin Street, install wombat raised priority crossings on the Fitzroy and Percy Street roundabouts, zebra crossings at midblock.
- Guy Street - Locke Street - WARWICK — Completed, $929.5kStandardise the speed limit to 40 km/h along Guy Street from Percy Street to Fitzroy Street and install wombat raised priority crossings on each leg of the Guy Street/Fitzroy.
- Mount Marshall-Clintonvale Road, Mount Marshall — Completed, $718kNumerous defects in the pavementStabilise the pavement with a cementitious blend to renew the asset to its full life and provide increased resilience to future rain eventsTotal.
- Glen Road Willi Street WARWICK — Completed, $529kClose Y-intersection of Glen Rd-Willi St, update signage and linemarking. Widen intersection of Glen Rd-Tooth St, install channelised turning lanes
Other named projects
- Cunningham Highway (Ipswich – Warwick), 2020 Disaster Recovery Funding Arrangements reconstruction works — Completed, TransportTransport and Main Roads
- Cunningham Highway (Ipswich – Warwick), Cunninghams Gap to west of Gladfield rest area, pavement strengthening — Construction, TransportThe Queensland Government has commenced pavement strengthening works on the Cunningham Highway between Main Range National Park at Tregony and Gladfield to improve safety and.
- Cunningham Highway (Ipswich – Warwick), Tregony to Maryvale, improve safety — Construction, TransportThe project involves safety improvements on a 4 km section of the Cunningham Highway between Tregony and Maryvale, northeast of Warwick. Construction commenced in August 2025 and.
- Cunningham Highway (Warwick – Inglewood), improve safety — Completed, TransportTransport and Main Roads
- New England Highway (Toowoomba - Warwick), improve safety — Construction, TransportThe Queensland Government is improving safety on sections of the New England Highway between Steele Rudd Road, East Greenmount, and the Cunningham Highway intersection at Eight.
- Willowvale Road, Willowvale — Completed, TransportRoad damaged during May 2022 flood eventRepairs and improved road surface resilience via concrete stabilised pavementTotal cost of proposed project is $500,472
HtAG Projects · as at 23 September 2026