All councils · Tasmania · Australia map
Hobart City Infrastructure Projects, TAS
Non-residential building approvals over the last 12 months are 1.41× this council’s own three-year average. Those approvals are $270.6m.
Hobart City’s economy is centred on health care and social assistance, education and training, public administration, professional services, accommodation and food services, and retail. In 2021, health accounted for 18.1% of employed residents, education 13.11%, public administration 10.4%, accommodation and food 10.44%, and professional services 9.49%. The labour market was tight in 2026 Q1, with a 2.9% unemployment rate, while the population was broadly flat in 2025 at 55,859 after a -0.2% annual change. The current project program is large and mixed, with 44 named projects, 22 active and 18 proposed. The most material pattern is major city-shaping civic work around Macquarie Point, supported by transport access upgrades, Royal Hobart Hospital and mental health projects, and water system works that align with precinct enablement and service capacity.
Named projects
44 projects.
| Type | Proposed | Active | Completed |
|---|---|---|---|
| Civic | 9 | 6 | 0 |
| Transport | 2 | 3 | 4 |
| Health | 1 | 6 | 0 |
| Water | 3 | 3 | 0 |
| Tourism | 3 | 0 | 0 |
| Sport | 0 | 2 | 0 |
| Energy | 0 | 1 | 0 |
| School | 0 | 1 | 0 |
Largest stated values
Proposed
- TMAG Modern — Planning, $400mTasmanian Museum and Art Gallery
- Wilkinson's Point Precinct & Derwent Entertainment Centre — Announced, $300m
- Macquarie Wharf Redevelopment — Planning, $240mTasPorts
- Cadbury Experience Project — Planning, $155m
- Ridgeway Dam Safety Upgrade — Planning, $148mTasWater
- 28-30 Davey St Hotel — Announced, $130m
- Older Persons Mental Health Facility — Announced, $82.6mDepartment of Health
Active
- Macquarie Point Multipurpose Stadium — Construction, $1.1bnMacquarie Point Development Corporation
- Tasman Bridge upgrades — Construction, $130mDepartment of State Growth
- Fragrance Towers Elizabeth Street — Construction, $80m
Other named projects
- 125 Bathurst Street (Hotel incl Bar and Restaurant) — Announced, Tourism
- 79 Collins Street — Announced, Civic
- Cameron Bay STP - Outfall upgrade — Announced, WaterTasWater
- Child and Adolescent Mental Health Inpatient Unit and Day Facility — Approved, HealthDepartment of Health
- Collins Street Vision — Announced, CivicLocal Government
- Doyle Avenue, Lenah Valley — Completed, TransportAsset management driven project relating to the condition of existing road surface and pavement. Asphalt inlay and partial road pavement repair.
- Elizabeth Street Vision Plan - Morrison Street to Federal (inc Mall and Wellington Court) - Renewal — Announced, CivicLocal Government
- Elizabeth Street, North Hobart — Completed, TransportSurface cracking and pavement deformation. Asphalt inlay, Additional funds by Council.
- Fern Tree Major WTP Upgrade / Replacement — Announced, WaterTasWater
- Goods Shed Relocation — Construction, CivicMacquarie Point Development Corporation
- Goulburn St, West Hobart — Completed, TransportAsset management driven project relating to the condition of existing road surface and pavement. Work consist of the renewal of asphalt wearing course and partial road pavement.
- Hampden Road Streetscape Plan — Announced, TransportLocal Government
- Hobart City High School — Construction, SchoolDepartment of Education
- Hobart Women's Shelter - Container Replacement Program — Approved, CivicHomes Tasmania
- LUMS Tasman Bridge, Tasman ITS — Construction, TransportDepartment of State Growth
- Macquarie Point Northern Access — Approved, CivicDepartment of State Growth
- Macquarie Point STP Relocation — Construction, WaterTasWater
- Mellifont Street, West Hobart — Completed, TransportThis project involves resurfacing works to address surface cracking and pavement deformation. The works include asphalt resurfacing and localised pavement strengthening.
- Moss Hotel — Announced, Tourism
- New St Johns Park Mental Health Facility — Construction, HealthDepartment of Health
- New Town Basketball Stadium — Approved, SportLocal Government
- New Town Sporting Precinct — Announced, CivicLocal Government
- Project Unify — Planning, CivicDepartment of Police, Fire and Emergency Management
- RHH Emergency Department Expansion Stage 2 — Approved, CivicDepartment of Health
- Ridgeway Dam Upgrade — Construction, WaterTasWater
- Ridgeway Upper Reservoir Upgrade — Construction, WaterTasWater
- Royal Hobart Hospital A Block Redevelopment — Approved, HealthDepartment of Health
- Royal Hobart Hospital Diagnostic Breast Care Centre - Liverpool St Clinics — Approved, HealthDepartment of Health
- Royal Hobart Hospital Paediatric Outpatients relocation — Approved, HealthDepartment of Health
- Royal Hobart Hospital Pharmacy Redevelopment — Construction, HealthDepartment of Health
- SEVENTY | Collins — Construction, CivicDepartment of Police, Fire and Emergency Management
- Southern Outlet transit lane - Stage 2 and 3 — Construction, TransportDepartment of State Growth
- TMAG Asset Maintenance - 10 Year Plan — Planning, CivicTasmanian Museum and Art Gallery
- Zero Emissions Bus Trials - Hydrogen — Construction, EnergyMetro Tasmania
Read full overview
Hobart City combines a service-led capital city economy with a project program concentrated in civic, health, transport and water works, led by the Macquarie Point precinct and hospital upgrades.
Economic base
Hobart City is a service-heavy capital city economy rather than a resource or industrial one. In 2021, the largest shares of employed residents were in health care and social assistance at 18.1%, education and training at 13.11%, accommodation and food services at 10.44%, public administration and safety at 10.4%, and professional, scientific and technical services at 9.49%. Business counts point to the same structure: there were 1,017 registered health care and social assistance businesses, 1,182 professional services businesses, 561 accommodation and food businesses and 428 retail businesses in June 2025. The education profile is high, with 49.01% holding a bachelor degree or higher, which is consistent with a knowledge-intensive workforce and central-city service demand.
Current operating conditions are firm but population growth is not carrying the story. Hobart City had 55,859 residents in 2025, down -138 people or -0.2% over the year, with net internal migration of -953 partly offset by net overseas migration of 892. The labour market remained tight in 2026 Q1, with a labour force of 32,979, 945 unemployed people and an unemployment rate of 2.9%. Non-residential building approvals were $270.6m over the latest 12 months to June 2026, or 1.41× the council’s own three-year average, indicating a comparatively elevated volume of approved non-residential work. That aligns with the concentration of hospital, civic, transport and utility projects now in progress or moving through approvals.
Project program
The current program is broad, with 44 named projects: 22 active, 18 proposed and 4 completed. The dominant pattern is civic and city-centre work, alongside major health, transport and water activity. The largest active project is the Macquarie Point Multipurpose Stadium at $1.1bn in construction, with associated Macquarie Point Northern Access at $75.9m approved, Macquarie Point STP Relocation at $60m in construction and Goods Shed Relocation at $10m in construction. Other large proposed civic and visitor-facing items include TMAG Modern at $400m, Wilkinson's Point Precinct & Derwent Entertainment Centre at $300m and the Cadbury Experience Project at $155m. This concentration makes the waterfront and central-city precincts the clearest focal point of current capital works.
Outside the waterfront precinct, the active schedule also includes substantial service and access works. Health projects include RHH Emergency Department Expansion Stage 2 at $60m approved, New St Johns Park Mental Health Facility at $47m in construction, Child and Adolescent Mental Health Inpatient Unit and Day Facility at $42m approved, Royal Hobart Hospital A Block Redevelopment at $23.9m approved and Royal Hobart Hospital Pharmacy Redevelopment at $21.9m in construction. Transport works are led by Tasman Bridge upgrades at $130m in construction, Southern Outlet transit lane - Stage 2 and 3 at $70m in construction and LUMS Tasman Bridge, Tasman ITS at $8m in construction.
Economic connections
The clearest supported connection is between the central-city service economy and the concentration of hospital, civic and visitor infrastructure. Hobart’s workforce mix is weighted to health, education, public administration, accommodation and food services, and professional services, and the project list is similarly concentrated in hospital expansions, civic precinct works, museums and visitor facilities. Royal Hobart Hospital works and the mental health projects align with added health service capacity in the city, which already has 6 open hospitals, including 1 public hospital. TMAG Modern, the TMAG maintenance plan, the proposed hotels and the Cadbury Experience Project are consistent with reinforcing the visitor, cultural and hospitality parts of the economy rather than industrial production.
A second connection runs through access and utility enablement. The Macquarie Point cluster combines the stadium with Northern Access, STP relocation and Goods Shed relocation, which supports the interpretation that precinct access and servicing are being addressed alongside the main venue. Tasman Bridge upgrades, the Southern Outlet transit lane works and Tasman ITS align with preserving road and bus access into the city and across the river, which matters for a CBD-based jobs market and hospital precinct. Water projects at Ridgeway, Fern Tree and Cameron Bay point to continued investment in dam, reservoir, treatment and outfall assets. Together these works could improve servicing reliability for existing residents, institutions and major precinct redevelopment, while elevated non-residential approvals suggest a sizeable approved construction workload around them.
Outlook
Near-term conditions depend less on population growth and more on delivery of the current capital works schedule. The council area has a large stated project book at $3.7bn across 42 priced projects, but the practical question is how much of the major city-centre and hospital work advances from planning and approval into construction. The active schedule already supports a substantial amount of on-site activity, and current approvals data indicate approved non-residential work remains above Hobart’s recent norm. That is consistent with ongoing pressure on city-centre contractors, traffic management and staging around major sites, especially where hospital, transport and precinct works overlap.
The main watch points are delivery sequencing and service enablement. For Macquarie Point, the key issue is whether the supporting access and utility works stay aligned with the stadium and broader precinct program. For health, it is whether the cluster of Royal Hobart and mental health projects materially expands usable service space over time. For utilities, it is progress on Ridgeway, Fern Tree and Cameron Bay, because those assets relate to water and wastewater servicing rather than discretionary placemaking. Population drift remains soft, so demand-side momentum should not be assumed; the stronger evidence is in institutional, civic and transport investment and in Hobart’s established role as Tasmania’s administrative, health, education and visitor centre.
Key takeaways
- Hobart City’s economy is anchored by health, education, public administration, professional services and hospitality, which matches the current emphasis on hospital, civic, museum and visitor projects rather than industrial works.
- The most material current project pattern is the Macquarie Point cluster, where the $1.1bn stadium sits alongside access, sewage treatment relocation and goods shed works, indicating precinct enablement as well as the main venue build.
- Transport and water upgrades are important support works: Tasman Bridge and Southern Outlet projects align with city access, while Ridgeway, Fern Tree and Cameron Bay works relate to water and wastewater servicing reliability.
Sources
- Health care and social assistance — ABS Census 2021
- Education and training — ABS Census 2021
- Accommodation and food services — ABS Census 2021
- Public administration and safety — ABS Census 2021
- Professional, scientific and technical services — ABS Census 2021
- Registered businesses, Health Care and Social Assistance — ABS Counts of Australian Businesses
- Registered businesses, Professional, Scientific and Technical Services — ABS Counts of Australian Businesses
- Registered businesses, Accommodation and Food Services — ABS Counts of Australian Businesses
- Registered businesses, Retail Trade — ABS Counts of Australian Businesses
- Bachelor degree or higher — ABS Census 2021
- Estimated resident population — ABS Regional Population
- Unemployment rate — Small Area Labour Markets
- Non-residential building approvals, latest 12 months — ABS Building Approvals
- Non-residential building approvals versus this council's own three-year average, weighted by the value of those approvals — ABS Building Approvals
- Population change — ABS Regional Population
- Population change — ABS Regional Population
- Net internal migration — ABS Regional Population
- Net overseas migration — ABS Regional Population
- Labour force — Small Area Labour Markets
- Unemployed persons — Small Area Labour Markets
- Macquarie Point Multipurpose Stadium — Tasmania infrastructure pipeline
- Macquarie Point Northern Access — Tasmania infrastructure pipeline
- Macquarie Point STP Relocation — Tasmania infrastructure pipeline
- Goods Shed Relocation — Tasmania infrastructure pipeline
- TMAG Modern — Tasmania infrastructure pipeline
- Wilkinson's Point Precinct & Derwent Entertainment Centre — Tasmania infrastructure pipeline
- Cadbury Experience Project — Tasmania infrastructure pipeline
- RHH Emergency Department Expansion Stage 2 — Tasmania infrastructure pipeline
- New St Johns Park Mental Health Facility — Tasmania infrastructure pipeline
- Child and Adolescent Mental Health Inpatient Unit and Day Facility — Tasmania infrastructure pipeline
- Royal Hobart Hospital A Block Redevelopment — Tasmania infrastructure pipeline
- Royal Hobart Hospital Pharmacy Redevelopment — Tasmania infrastructure pipeline
- Tasman Bridge upgrades — Tasmania infrastructure pipeline
- Southern Outlet transit lane - Stage 2 and 3 — Tasmania infrastructure pipeline
- LUMS Tasman Bridge, Tasman ITS — Tasmania infrastructure pipeline
- Ridgeway Dam Upgrade — TasWater
- Ridgeway Upper Reservoir Upgrade — TasWater
- Fern Tree Major WTP Upgrade / Replacement — Tasmania infrastructure pipeline
- Cameron Bay STP - Outfall upgrade — Tasmania infrastructure pipeline
- Goulburn St, West Hobart — Infrastructure Australia
- Elizabeth Street, North Hobart — Infrastructure Australia
- Mellifont Street, West Hobart — Infrastructure Australia
- Doyle Avenue, Lenah Valley — Infrastructure Australia
- Open public and private hospitals — AIHW MyHospitals
- Public hospitals — AIHW MyHospitals
- TMAG Asset Maintenance - 10 Year Plan — Tasmania infrastructure pipeline
- 28-30 Davey St Hotel — Tasmania infrastructure pipeline
- Moss Hotel — Tasmania infrastructure pipeline
- 125 Bathurst Street (Hotel incl Bar and Restaurant) — Tasmania infrastructure pipeline
HtAG Projects · as at 23 September 2026