All councils · Victoria · Australia map
Campaspe Infrastructure Projects, VIC
Non-residential building approvals over the last 12 months are 0.88× this council’s own three-year average. Those approvals are $53.5m.
Campaspe’s economic base is shaped by agriculture, health care, manufacturing, retail and construction. In 2021, health care and social assistance accounted for 15.67% of employed residents, agriculture 12.47% and manufacturing 10.4%, with 1,336 registered agriculture businesses and 749 in construction by June 2025. The current named project program is led by transport: two active road-related works sit alongside four completed transport upgrades, including the completed $160.5m Bendigo/Echuca Rail Line Upgrade. Current non-transport activity is more targeted, with Lancaster Solar Farm under construction, plus the Echuca Cancer And Wellness Centre and Echuca Twin Rivers Specialist School. These works align mainly with freight and access, service capacity and energy supply, while population was broadly flat at 37,954 in 2025 and non-residential approvals totalled $53.5m over the latest year.
Named projects
9 projects.
| Type | Proposed | Active | Completed |
|---|---|---|---|
| Transport | 0 | 2 | 4 |
| Energy | 0 | 1 | 0 |
| Health | 0 | 1 | 0 |
| School | 0 | 1 | 0 |
Largest stated values
Active
- Various Rural Intersection Safety Upgrades — Construction, $23.4mThis project will involve various safety treatments at 30 high-speed and high-risk intersections that have a high rate of casualty crashes and are located on strategically.
- Echuca to Robinvale - Project Scoping — Construction, $2.5mThis project will undertake scoping works to identify priorities and develop a package of delivery works on the Murray Valley Highway between Echuca and Robinvale.
Completed
- Bendigo/Echuca Rail Line Upgrade — Completed, $160.5mThe Bendigo/Echuca Rail Line Upgrade will deliver signalling upgrades between Bendigo and Epsom/Eaglehawk and track works between Epsom and Echuca. Signalling upgrade works.
- High Street, Rushworth — Completed, $1mRehabilitation of the existing pavement as it has reached intervention level, it is described as being in very poor condition with serviceability now being affected and increased.
- Morton Road, Rochester — Completed, $1mExisting pavement has reached intervention level, it is described as being in very poor condition with serviceability now being affected and increased maintenance costs Work will.
- Trewin Road, Burramboot — Completed, $572.2kRehabilitation of the existing pavement as it has reached intervention level, it is described as being in very poor condition with serviceability now being affected and increased.
Other named projects
- Echuca Cancer And Wellness Centre — Construction, HealthVictorian Health Building Authority
- Echuca Twin Rivers Specialist School — Construction, SchoolVictorian School Building Authority
- Lancaster Solar Farm — Construction, EnergyAEMO
Read full overview
Campaspe’s economy is anchored by agriculture, health care, manufacturing and construction, while the current project program is concentrated in transport works with selected additions to energy, health and specialist education.
Economic base
Campaspe is a regional economy with a broad base but clear weight in agriculture, health care and manufacturing. In 2021, health care and social assistance accounted for 15.67% of employed residents, agriculture for 12.47%, manufacturing for 10.4%, retail for 9.67% and construction for 9.21%. The business base shows the same spread: by June 2025 the council had 4,368 registered businesses, including 1,336 in agriculture, 749 in construction, 342 in rental, hiring and real estate services, 265 in other services, 249 in retail, 235 in professional services, 224 in transport and warehousing, 215 in health care and social assistance, and 185 in manufacturing. This points to a mixed rural service economy built around farm production, local servicing, trade activity and health provision rather than a single-industry profile.
Current labour market and demographic settings are stable rather than fast-moving. The labour force was 19,402 in 2026 Q1, with 580 unemployed and a 3% unemployment rate. Population was 37,954 in 2025, down by -30 people or -0.1%, with natural increase at -33, net internal migration at -79 and net overseas migration at 82. Campaspe’s median age was 47 in 2021, bachelor degree or higher attainment was 11.81%, and vocational qualifications were 31.6%. Median weekly household income was $1,264 and median weekly personal income was $668. Together, these indicators are consistent with a mature regional catchment where service delivery, transport reliability and practical workforce skills matter as much as headline population growth.
Current project program
The named project program is concentrated in transport, with 9 projects identified overall, including 5 active and 4 completed. Transport accounts for 2 active projects and all 4 completed projects. The largest completed item is the Bendigo/Echuca Rail Line Upgrade at $160.5m, completed in 2023. Completed local road works include High Street, Rushworth at $1m, Morton Road, Rochester at $1m and Trewin Road, Burramboot at $572.2k. Active transport works are Various Rural Intersection Safety Upgrades at $23.4m and Echuca to Robinvale - Project Scoping at $2.5m. This pattern shows that recent public investment has been dominated by access and safety works rather than a broad spread of civic asset classes.
Outside transport, the current schedule is selective but relevant to core services and energy. Lancaster Solar Farm is under construction in Lancaster. In Echuca, the Echuca Cancer And Wellness Centre and Echuca Twin Rivers Specialist School are both under construction. Across projects with printed values, the list totals $189m, but that figure covers only 6 projects with stated amounts and should be read as printed project values rather than local output. Separately, non-residential building approvals were $53.5m in the latest 12 months to June 2026, equal to 0.88× the council’s own three-year average. That approvals reading indicates a continuing flow of approved non-residential work, while the named project mix remains centred on transport with targeted additions in health, education and energy.
Economic connections
The strongest evidenced connection between the economy and the project list is transport. Campaspe has a sizeable agriculture base, 224 registered transport and warehousing businesses, and 79 wholesale businesses, so road safety upgrades, road scoping work and the completed Bendigo/Echuca rail upgrade align with the practical need to move farm output, supplies and regional service traffic more reliably. This is an access and freight mechanism rather than a guaranteed growth outcome. The concentration of current and completed transport projects is therefore consistent with an economy that depends on regional movement between production areas, town centres and external markets.
The other clear mechanisms are service capacity, construction activity and energy supply. Health care is the largest employment industry at 15.67% of employed residents, and the Echuca Cancer And Wellness Centre aligns with added specialist health capacity in a council that already has 3 public hospitals, 8 residential aged care homes with 564 places, and a median age of 47. The specialist school project similarly aligns with expanded education and care capacity in Echuca. Lancaster Solar Farm under construction is consistent with additional generation entering the local and regional electricity system, which may support supply diversity, although the evidence does not state local load outcomes. With 749 registered construction businesses, 305 employing construction businesses and $53.5m in non-residential approvals over the latest year, the current works also support a continuing volume of building and civil activity.
Outlook
Near-term monitoring should focus on whether the current transport-heavy program converts into visibly better access and whether the non-transport works add usable service capacity in Echuca. Campaspe’s economy does not rely on rapid population expansion; instead, it appears more sensitive to operating conditions across farming, health services, trade, transport and construction. With population effectively flat in 2025 and internal migration negative, infrastructure that improves reliability and service reach may matter more than headline growth indicators. The practical question is whether the current works reduce friction for freight and travel while broadening the health and education offer in the council’s main service centres.
The main watchpoints are straightforward. First, active transport works remain the largest current theme, so stage progress on the rural intersection package and the Echuca to Robinvale scoping work will be the clearest signals on further access investment. Second, commissioning of the cancer and wellness centre, specialist school and solar farm would shift the current program from construction activity to operating capacity. Third, non-residential approvals and labour market readings will indicate whether building and civil activity is being maintained after the recent wave of completed transport upgrades. Those indicators are observable and more useful here than broad claims about economic acceleration.
Key takeaways
- Campaspe’s economy is anchored by agriculture, health care, manufacturing and construction, with health care and social assistance the largest employment industry at 15.67% and agriculture supported by 1,336 registered businesses.
- The current named project pattern is transport-led: 2 active transport projects and 4 completed transport projects dominate the list, including the completed $160.5m Bendigo/Echuca Rail Line Upgrade and the active $23.4m rural intersection safety program.
- Non-transport works are targeted rather than broad, with current construction on Lancaster Solar Farm, the Echuca Cancer And Wellness Centre and Echuca Twin Rivers Specialist School aligning with energy supply and service capacity rather than general civic expansion.
Sources
- Health care and social assistance — ABS Census 2021
- Agriculture, forestry and fishing — ABS Census 2021
- Manufacturing — ABS Census 2021
- Registered businesses — ABS Counts of Australian Businesses
- Unemployment rate — Small Area Labour Markets
- Estimated resident population — ABS Regional Population
- Retail trade — ABS Census 2021
- Construction — ABS Census 2021
- Registered businesses, Agriculture, Forestry and Fishing — ABS Counts of Australian Businesses
- Registered businesses, Construction — ABS Counts of Australian Businesses
- Registered businesses, Rental, Hiring and Real Estate Services — ABS Counts of Australian Businesses
- Registered businesses, Other Services — ABS Counts of Australian Businesses
- Registered businesses, Retail Trade — ABS Counts of Australian Businesses
- Registered businesses, Professional, Scientific and Technical Services — ABS Counts of Australian Businesses
- Registered businesses, Transport, Postal and Warehousing — ABS Counts of Australian Businesses
- Registered businesses, Health Care and Social Assistance — ABS Counts of Australian Businesses
- Registered businesses, Manufacturing — ABS Counts of Australian Businesses
- Labour force — Small Area Labour Markets
- Unemployed persons — Small Area Labour Markets
- Population change — ABS Regional Population
- Population change — ABS Regional Population
- Natural increase — ABS Regional Population
- Net internal migration — ABS Regional Population
- Net overseas migration — ABS Regional Population
- Median age — ABS Census 2021
- Bachelor degree or higher — ABS Census 2021
- Advanced diploma, diploma or certificate — ABS Census 2021
- Median household income (weekly) — ABS Census 2021
- Median personal income (weekly) — ABS Census 2021
- Bendigo/Echuca Rail Line Upgrade — Infrastructure Australia
- Lancaster Solar Farm — AEMO
- Echuca Cancer And Wellness Centre — Victorian Health Building Authority
- Echuca Twin Rivers Specialist School — Victorian School Building Authority
- High Street, Rushworth — Infrastructure Australia
- Morton Road, Rochester — Infrastructure Australia
- Trewin Road, Burramboot — Infrastructure Australia
- Various Rural Intersection Safety Upgrades — Infrastructure Australia
- Echuca to Robinvale - Project Scoping — Infrastructure Australia
- Non-residential building approvals, latest 12 months — ABS Building Approvals
- Non-residential building approvals versus this council's own three-year average, weighted by the value of those approvals — ABS Building Approvals
- Registered businesses, Wholesale Trade — ABS Counts of Australian Businesses
- Public hospitals — AIHW MyHospitals
- Residential aged care homes — AIHW GEN aged care
- Residential aged care places — AIHW GEN aged care
- Employing businesses, Construction — ABS Counts of Australian Businesses
HtAG Projects · as at 23 September 2026