All councils · Victoria · Australia map
Glen Eira Infrastructure Projects, VIC
Non-residential building approvals over the last 12 months are 1.49× this council’s own three-year average. Those approvals are $173.2m.
Glen Eira is a built-up metropolitan services economy rather than an industrial or resource area. Employed residents are concentrated in professional, health, education, retail and financial services, supported by a highly educated population, 17,306 registered businesses and sizeable local service capacity including 6 hospitals, 107 childcare services and 18 aged care homes. The current named project program is narrow and urban in character: three active transport projects recorded under Next Generation Rapid Transport for Melbourne’s Southeast, plus construction of the Southern Autistic School in Bentleigh. Separately, non-residential building approvals reached $173.2m in the latest year, 1.49× Glen Eira’s own three-year average, indicating elevated approved institutional and commercial work. The main practical watch points are delivery of the transport works, commissioning of the specialist school, and whether approvals convert into sustained construction activity.
Named projects
5 projects.
| Type | Proposed | Active | Completed |
|---|---|---|---|
| Transport | 0 | 1 | 3 |
| School | 0 | 1 | 0 |
Largest stated values
Active
- Next Generation Rapid Transport for Melbourne’s Southeast — Construction, $6mThe project will develop a preliminary business case to investigate transport solutions and corridor options in Melbourne's south-eastern suburbs, linking Caulfield Station to.
Completed
- Furneaux Grove, St Kilda East — Completed, $760.6kA recent site inspection and condition assessment indicated that the road is uneven; Kerb & channel are in dilapidated condition and need reconstruction. About 470m long kerb &.
- Lawrance Street, Murrumbeena — Completed, $630kAbout 550 m long concrete kerb & channel and 2400 sqm of roads are dilapidated condition. The roads have deteriorated over the years and uneven, showing signs of failures. Vehicle.
- Ercildoune Street, Caulfield North — Completed, $512kApproximately 450m long bluestone kerb & channel and 1600sqm of roads are dilapidated condition. The roads have deteriorated over the years and uneven, showing signs of failures.
Other named projects
- Southern Autistic School — Construction, SchoolVictorian School Building Authority
Read full overview
Dense inner-south-east services economy with current project activity centred on transport works and one specialist school build.
Economic base
Glen Eira’s economy is best understood as a dense metropolitan services base with a large professional and care economy, rather than a freight, industrial or land-extensive one. In 2021 the largest shares of employed residents worked in professional, scientific and technical services (14.14%), health care and social assistance (13.89%), education and training (10.66%), retail trade (9.33%) and financial and insurance services (6.56%). The resident workforce was highly credentialled, with 46.36% holding a bachelor degree or higher, and median household income was $2,133 weekly. These settings align with demand for local schools, health services, childcare and everyday retail rather than heavy infrastructure for production industries.
Business counts reinforce that profile. As at June 2025, Glen Eira had 17,306 registered businesses and 4,884 employing businesses, with the largest registered concentrations in professional services (3,241), rental, hiring and real estate services (2,778), construction (1,899) and health care and social assistance (1,817). Local service capacity is also substantial for a compact urban municipality, including 6 hospitals, 107 approved centre-based childcare services with 9,347 places, and 18 residential aged care homes with 1,615 places. Population reached 163,025 in 2025, up 1.6% over the year, with growth driven by net overseas migration of 2,876 while net internal migration was -1,008.
Current project program
The current named project list is concentrated in transport. Glen Eira has 7 named projects in total: 4 active and 3 completed. Active work comprises three separate construction entries recorded under Next Generation Rapid Transport for Melbourne’s Southeast, each carrying a printed value of $6m, plus construction of the Southern Autistic School in Bentleigh. Because the three transport entries sit in one narrative group where values may not be summed, they should be read as repeated works within the same named transport program rather than as a combined local total.
Completed work on the current list is also transport-led and local in scale: Furneaux Grove, St Kilda East ($760.6k), Ercildoune Street, Caulfield North ($512k) and Lawrance Street, Murrumbeena ($630k). Across the list, 6 projects carry printed values totalling $19.9m, but that figure should be treated as a list total only, not as output or a measure of economic impact. Outside the named list, non-residential building approvals were $173.2m in the year to June 2026, or 1.49× Glen Eira’s own three-year average, which indicates a comparatively elevated level of approved non-residential work moving through planning and approvals at the same time as the current transport and school construction schedule.
Economic connections
The strongest supported connection between Glen Eira’s economy and its current project program is urban access. With employed residents concentrated in professional, health, education and retail activities, and with 97,370 people in the labour force, transport works align with the practical need to move workers, students and service users across a dense metropolitan area. The three active Next Generation Rapid Transport for Melbourne’s Southeast entries are therefore consistent with access improvements being the main infrastructure mechanism in this council, rather than freight enablement, water security or grid capacity. That matters in an area where the economic base depends heavily on commuting, local service consumption and access to dispersed institutions.
The school project links more directly to specialist service capacity. Construction of the Southern Autistic School in Bentleigh could improve education capacity for students requiring specialist settings, which is a practical fit with Glen Eira’s broader education and health-oriented service profile. Elevated non-residential building approvals also align with ongoing institutional and commercial space renewal, while Glen Eira’s large construction business base of 1,899 registered firms and 533 employing firms is consistent with local exposure to design, trades and fit-out activity during approval and build phases. These are capacity and activity links; the evidence does not support stronger claims about measured economic outcomes from the projects themselves.
Outlook
Near-term conditions point to steady service demand rather than a change in economic character. Population growth of 1.6% in 2025, driven by net overseas migration, adds to demand for schools, childcare, health care and everyday transport access in an already built-up municipality. Labour market settings remain relatively firm, with a 4.2% unemployment rate in March quarter 2026. In that context, the current project pattern looks like incremental capacity support for a mature urban services economy: transport works that may improve movement across the south-east, and a specialist school build that may add targeted education capacity.
What to watch is execution rather than scale. The named program is not broad across utilities or major civic assets, so delivery progress on the transport entries and the timing of the Southern Autistic School matter more than headline project counts. A second indicator is whether the recent $173.2m in non-residential approvals translates into ongoing building work over coming periods, because approvals measure approved work only. If approvals remain above Glen Eira’s recent average while current projects move through construction, that would be consistent with continued institutional and commercial renewal across the municipality.
Key takeaways
- Glen Eira’s economy is primarily metropolitan and service-based, with employed residents concentrated in professional, health, education, retail and financial services and supported by a highly educated resident base.
- The active named project program is tightly focused on transport access, with three construction entries under Next Generation Rapid Transport for Melbourne’s Southeast, plus one specialist school project in Bentleigh.
- Non-residential building approvals of $173.2m in the latest year, or 1.49× Glen Eira’s own three-year average, point to elevated approved non-residential work alongside the current project schedule.
Sources
- Professional, scientific and technical services — ABS Census 2021
- Registered businesses — ABS Counts of Australian Businesses
- Open public and private hospitals — AIHW MyHospitals
- Estimated resident population — ABS Regional Population
- Health care and social assistance — ABS Census 2021
- Education and training — ABS Census 2021
- Retail trade — ABS Census 2021
- Financial and insurance services — ABS Census 2021
- Bachelor degree or higher — ABS Census 2021
- Median household income (weekly) — ABS Census 2021
- Employing businesses — ABS Counts of Australian Businesses
- Registered businesses, Professional, Scientific and Technical Services — ABS Counts of Australian Businesses
- Registered businesses, Rental, Hiring and Real Estate Services — ABS Counts of Australian Businesses
- Registered businesses, Construction — ABS Counts of Australian Businesses
- Registered businesses, Health Care and Social Assistance — ABS Counts of Australian Businesses
- Approved centre-based childcare services — ACECQA national register
- Approved childcare places — ACECQA national register
- Residential aged care homes — AIHW GEN aged care
- Residential aged care places — AIHW GEN aged care
- Population change — ABS Regional Population
- Net overseas migration — ABS Regional Population
- Net internal migration — ABS Regional Population
- Non-residential building approvals, latest 12 months — ABS Building Approvals
- Southern Autistic School — Victorian School Building Authority
- Non-residential building approvals versus this council's own three-year average, weighted by the value of those approvals — ABS Building Approvals
- Labour force — Small Area Labour Markets
- Employing businesses, Construction — ABS Counts of Australian Businesses
- Unemployment rate — Small Area Labour Markets
HtAG Projects · as at 23 September 2026