All councils · Victoria · Australia map

Macedon Ranges Infrastructure Projects, VIC

Non-residential building approvals over the last 12 months are 1.23× this council’s own three-year average. Those approvals are $124.5m.

Macedon Ranges combines a sizeable commuter base with local service activity in construction, health, education, retail and transport, alongside a large small-business base in construction, professional services and agriculture. Population reached 54,464 in 2025, up 1.6%, while unemployment was 1.6% in 2026 Q1. The current named project program is dominated by transport: 7 active transport projects, 7 completed transport projects and 1 proposed transport project, plus 1 active health project. The largest current item attached to the council is the $3.1bn Suburban Roads Upgrades program, while local works also include repeated Macedon and Mitchell Shire Roads packages and a small Gisborne road project. Completed rail and local road works indicate an ongoing emphasis on access and network reliability, with the Cobaw health hub the main non-transport capacity addition to monitor.

Named projects

13 projects.

TypeProposedActiveCompleted
Transport147
Health010

Largest stated values

Proposed

  1. Outer Metropolitan Ring / E6 Corridor - Detailed Business Case — Planning, $20m
    The Australian and Victorian governments are jointly planning to undertake a Detailed Business Case to investigate the planning, design development and delivery along Melbourne’s.
    Start TBD – Finish TBD

Active

  1. Suburban Roads Upgrades - South Eastern Roads and Northern Roads — Construction, $3.1bn
    This investment involves the upgrade of selected suburban roads in Melbourne’s south-east and north.
    Start Early 2021 – Finish Mid 2029
  2. Macedon and Mitchell Shire Roads — Construction, $11.3m
    This project will upgrade and improve roads across the Macedon Ranges and Mitchell Shire regions. Roads to be upgraded in the Macedon Ranges Shire Council include Old Lancefield.
    Start Early 2024 – Finish Mid 2026
  3. Melbourne to Mildura - Project Development and Preconstruction — Construction, $4.4m
    This project will undertake scoping and development to inform a future program of works for Calder Highway between Melbourne to Mildura corridor, Victoria.
    Start Early 2022 – Finish Mid 2026
  4. Swinburne Avenue (East Side), Gisborne — Construction, $790k
    Poor condition pavement, seal, road beyond maintenance and requires rehabilitation. Improve Drainage issues by renewing Kerb on east side Full depth Pavement reconstruction with.
    Start Aug 2025 – Finish Aug 2026

Completed

  1. Bendigo/Echuca Rail Line Upgrade — Completed, $160.5m
    The Bendigo/Echuca Rail Line Upgrade will deliver signalling upgrades between Bendigo and Epsom/Eaglehawk and track works between Epsom and Echuca. Signalling upgrade works.
    Start Late 2020 – Finish Late 2023
  2. Hamilton Road, New Gisborne — Completed, $1.4m
    Hamilton Road from Kilmore Road is failing at a number of locations and the road is beyond maintenance and requires rehabilitation.Pavement rehabilitation, including road shoulder.
    Start Sep 2023 – Finish Apr 2024
  3. Malmsbury East Road, Malmsbury — Completed, $790.8k
    Poor condition pavement and seal, road beyond maintenance and requires rehabilitation. Pavement rehabilitation and sealing, including sealed shoulder, drainge improvements and.
    Start Nov 2025 – Finish Jun 2026
  4. Stawell Street, Romsey — Completed, $683.3k
    Very poor pavement condition and asphalt seal, road beyond maintenance and requires reconstruction. Full depth road reconstruction with asphalt wearing course, drainage.
    Start Mar 2025 – Finish Oct 2025
  5. Three Chain Road, Newham — Completed, $657.9k
    Poor condition road with numerous pavement failures.Road reconstruction including pavement rehabilitation/stabilisation.Total cost of proposed project is $657,900
    Start Sep 2023 – Finish Apr 2024

Other named projects

Read full overview

A high-participation commuter and service economy with a transport-heavy works program and one active community health project.

Economic base

Macedon Ranges is best read as a high-participation peri-urban economy with a broad resident workforce and a strong small-business base rather than a single-industry market. In 2025 the council had 54,464 residents, up 1.6% over the year, with growth supported by net internal migration of 518 and net overseas migration of 194. The labour force was 29,834 in 2026 Q1 and the unemployment rate was 1.6%. Census data show employed residents concentrated in construction at 12.81%, health care and social assistance at 11.65%, education and training at 10.1%, public administration and safety at 8.09%, professional services at 7.9% and retail at 7.51%.

Business counts reinforce that mix. As at June 2025 there were 5,536 registered businesses and 2,059 employing businesses. Construction was the largest business cohort with 1,226 registered and 564 employing businesses, followed by professional services with 750 registered and 278 employing businesses, agriculture with 588 registered businesses, rental and real estate with 437, health care and social assistance with 349, retail with 312 and transport, postal and warehousing with 207. Household and skills indicators also point to relatively strong resident capacity, including median household income of $2,059 weekly, 26.74% with a bachelor degree or higher, and SEIFA deciles of 9 or 10 across the listed measures.

Current project program

The current named project list is dominated by transport. There are 16 named projects in total: 8 active, 7 completed and 1 proposed. Transport accounts for 7 active projects, all 7 completed projects and the sole proposed project; the only non-transport item is the active Cobaw Community Health Services Healthy Community Access Hub. The largest current project attached to the council is the $3.1bn Suburban Roads Upgrades - South Eastern Roads and Northern Roads in construction. Other active transport works include four separate Macedon and Mitchell Shire Roads construction packages, each listed at $11.3m and not treated as a single summed figure, Melbourne to Mildura - Project Development and Preconstruction at $4.4m, and Swinburne Avenue (East Side), Gisborne at $790k.

Completed work is also mostly network-facing. The Bendigo/Echuca Rail Line Upgrade was completed in October 2023 at $160.5m. Local road works completed in 2024 to 2026 include Hamilton Road, New Gisborne at $1.4m, Three Chain Road, Newham at $657.9k, Lauriston Road, Kyneton at $553.9k, Stawell Street, Romsey at $683.3k, Malmsbury East Road, Malmsbury at $790.8k and Boundary Road, Romsey at $575.9k. The only proposed item is the Outer Metropolitan Ring / E6 Corridor - Detailed Business Case at $20m. Separately, non-residential building approvals reached $124.5m in the latest 12 months, 1.23× the council’s own three-year average, indicating a relatively elevated level of approved non-residential work alongside the named program.

Economic connections

The clearest supported connection between the local economy and the project schedule is transport access. Macedon Ranges has meaningful resident employment in construction, health, education, public administration, retail and transport, and it also has 207 registered transport businesses plus 145 wholesale businesses and 588 agriculture businesses. In that setting, repeated road packages and larger state transport works align with day-to-day movement of workers, service delivery and freight across and beyond the council area. The completed Bendigo/Echuca Rail Line Upgrade and the active Melbourne to Mildura preconstruction work are also consistent with maintaining regional rail corridors that support passenger and freight connectivity, while local road upgrades can support safer and more reliable access to townships and work sites.

The Cobaw Community Health Services Healthy Community Access Hub is the main direct social-infrastructure addition in the current list. With health care and social assistance accounting for 11.65% of employed residents, 349 registered businesses in that sector, one open public hospital in the council, 47 approved centre-based childcare services, and 7 residential aged care homes with 669 places, extra community health capacity aligns with a service economy that already carries substantial care demand. The current project mix therefore supports two practical mechanisms: transport works that may improve access and network reliability for residents and local businesses, and health investment that could improve community service capacity.

Outlook

Near-term monitoring should focus on whether the transport-heavy schedule resolves into finished access improvements rather than remaining concentrated in broad state programs and multiple small road packages. The largest value exposure attached to the council is still the $3.1bn Suburban Roads Upgrades program, but local relevance will depend on where delivered benefits and traffic effects are felt. The four Macedon and Mitchell Shire Roads packages are more directly local, and their completion timing will be easier to observe. The proposed Outer Metropolitan Ring / E6 Corridor business case is important to watch because any movement beyond planning would signal a larger shift in future metropolitan-edge transport planning affecting the wider north and west of Melbourne.

The other practical watchpoint is service capacity as population continues to rise. Population growth of 879 people in 2025, mainly via migration, adds pressure to local health, care and daily-service networks. Completion of the Cobaw health hub is therefore more material than its unlisted project value suggests, because it is the only active non-transport project in the named schedule. A second indicator is whether non-residential approvals remain elevated after the current $124.5m reading; that would be consistent with continued approved investment in business and service premises, although approvals do not measure completion. If approvals ease and the road schedule finishes without replacement projects, the visible works program could narrow materially.

Key takeaways

Sources

HtAG Projects · as at 23 September 2026